Jump to content

Showing off. My new workshop setup


Delroyb

Recommended Posts

Thought I would show off my new workshop. It has taken my the best part of 6 months to construct the building, then fit it all out, but finally have the space I wanted. It's a 6.5x3m building, split in half with office/watch workshop in one half and machine room in the other.

IMG_20181011_105253.jpg

IMG_20181011_110848.jpg

IMG_20181001_144225.jpg

  • Like 9
Link to comment
Share on other sites

Very nice. I’m just wondering why you have decided to have your work station at the end. Don’t you think it will restrict your elbowroom? No matter how big your workshop might be it will never be big enough. Plenty of power points I see, you can never hve to many. Keeping the ladder propped up outside, is that so you can get away from it all.:D

Link to comment
Share on other sites

I think the perspective of the pic makes it look tighter than it really is. Given the layout of the rest of the room, which has my office desk in etc, it seemed like the most logical choice at the time (I even went as far as building a CAD model of the layout first). I also gives a nice deliniation between clean and dirty areas, putting the lathe (small one) as far away from the assembly area as possible. I have 600mm from the centre of the cutout to the wall, so plenty of space for my elbows. Completely agree on the power points, I figured I'd stick as many in as possible.

To right about not enough space, I'm already planning the demolition of my prefab concrete garage to build a bigger one which will give me space for a surface grinder and a larger mill. I have a Centec 2A at the moment but would like a larger machine in the future!

Link to comment
Share on other sites

8 hours ago, Peterburke340 said:

Did you cut out the watchmakers bench yourself??


Sent from my iPad using Tapatalk

Yes, its actually made from four spare floor boards, which are inch pine,  tounge and grove. I glued and pinned them, then fitted a 2x2 frame before going at it with the belt sander. Once it was mounte, I used a big compass, scribed the semi circle (using a bit of board tacked to the edge to give my centre), chopped it out with a jigsaw and routed the radius. I've basically been able to fit the whole place out with spare timber that came with the building (which arrived in kit form).

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



  • Recently Browsing

    • No registered users viewing this page.
  • Topics

  • Posts

    • Instead of using tweezers, put a piece of rodico onto a toothpick or pegwood. Then set your spring to the rodico, this way the spring is not under any tension when floating it back into the bloc. As you bump into the bloc when trying to find the entrance the rodico will give but still holds onto the spring ie. You wont have the rigidity of tweezers.
    • If frank says these bombè jewels are for balances and similar pivots then they are used cupped side facing the pivot and then capped i assume. In Nicklesilver's reply i guess that cup can also be reversed and used as an oil reservoir leaving the shoulder riding on a less frictioned domed surface. 🤷‍♂️ Hence the use of them on wheels closer to the escapement that have less torque requiring efforts to reduce friction and are also uncapped.
    • Looks that way, if it had any amount of significant jewel count it would say so on the dial.    Looks that way, if it had any amount of significant jewel count it would say so on the dial.  Same answer as Mike regarding the dial, its often just a slapped on name of a retailer but i thought you were way above this understanding Pete ?
    • Light naptha is what you need to be looking for. The carbon to hydrogen ratio is high with heavy naptha, it doesn't evaporate as well as light naptha and is prone to leaving more residue. Try tom's suggestion of the mirror test.
    • Its a big item Michael and a lot that could go wrong with the process of getting it to its new location. I once helped install one of these units into a conservatory that i had built. It was big and bloody heavy and took six of us to get it in safely. If you have sliding doors and you need to remove the whole frame then that may or may not go well. But i would advise getting a professional in if you have little knowledge on the installation of them. The glazing of the doors could well be 6mm laminated glass which again will be heavy very heavy if the glazing units are big. The glass would also need to be set up and packed correctly to open the doors properly more so if they are unframed and the sliders are upvc. Seems a shame but if no one is biting and that may be due to having no warranty i guess the only takers might be someone that installs them for a living and knows how to repair. If its fibreglass just be careful, i sometimes have to cut fibreglass baths out and they are nasty to work with . Thick gloves are definitely recommended,  not fun picking out fibreglass spells two days later that have started to go septic. Good luck with it all matey.
×
×
  • Create New...